Crate SupplyConstruction

Every job, built on better prices.

Lumber, drywall, concrete and electrical priced across your suppliers, charged to the job and delivered to the site. Catch price swings before you order and send one order per job.

General contractorsSpecialty tradesRemodelersProperty maintenance
01 / The product

Every job’s materials,
priced everywhere.

Lumber, drywall, concrete and electrical compared across your suppliers, charged to the job and delivered to the site.

Crate SupplyConstruction
Materials · Riverside remodel

Materials for this job

Saved vs. usual−$312.80On this order
Price increases caught03Lumber and drywall
Site deliveryTue7 am, Riverside remodel
ItemSupplier ASupplier BSupplier CStatus
2×4×8 SPF stud× 294 (unit)$1,247.60$1,183.20$1,215.90−5.2% saved
½ in drywall, 4 × 8× 50 sheets$712.50$738.00$726.40+4.8% price
Full view in your workspace

Prices before delivery. Each line is charged to the job it’s for.

02 / What you buy

Framing
to finish.

Each card shows the best price today for a material your crews use every week.

Lumber

2×4×8 SPF stud

× 294 (unit) · best price today
$1,183.20−5.2% saved
Drywall

½ in drywall, 4 × 8

× 50 sheets · best price today
$712.50+4.8% price
Concrete

Portland cement, Type I/II

94 lb × 40 · best price today
$604.40−2.2% saved
Electrical

Romex 12/2 NM-B

250 ft · best price today
$141.60Low stock

Prices before freight.

03 / Built for construction

Built around
the job.

Jobs, takeoffs, lead times, site delivery, job costing. The words you already use, with the numbers behind them.

Job costing

Every order charged to a job.

Each line carries the job it’s for, so material cost per job stays current instead of being reconciled at the end.

Riverside remodel · materials $18,400 of $21,000
Takeoffs

Turn a takeoff into an order.

Paste a materials list and it becomes a draft order priced across your suppliers.

42 lines · 3 suppliers · 1 order
Site delivery

Delivered where the crew is.

Each supplier’s lead time and delivery window sit next to the price, so the cheapest option still lands before the crew needs it.

Supplier B · 2-day lead time · delivers Tue 7 am
Price swings

Lumber and copper, watched.

Volatile materials are flagged when a supplier’s price moves, before you send the order.

½ in drywall · +4.8% since last order
Start with one order

Your suppliers.
A clearer way to buy.

Book a 30-minute demo. Bring a recent invoice and we’ll show you where the money goes.